Home//Municipal//Engineering
Tools & Calculators//Inlet Spacing
Inlet Spacing
Given: Pavement consists of two 10 ft. lanes with vertical
curb. SL = 2% ST = 2%. Two foot gutter. Permissible
spread on pavement 6 ft.
Step 1
- Spread: 6 + 2 = 8 ft.
- Depth at curb = 8 x .02 = .016 ft.
- Discharge for depth at curb Q = (.56 / N) Z (D 8/3) S 1/2 Solving
equation by calculator Q = 1.9 cfs
Step 2
Determine capacity and spacing of first inlet on the slope. Pavement area
which will produce equivalent discharge from equation: Q = CIA
- Assume C = 0.9 and I = 4"/HR.
- A = (Q / IC) = (1.85 / (4 x 0.9)) = 0.51 acres
- Length to first inlet L = A / W = (.051 x 43560) / 22 = 1010 ft.
Step 3
- Using Neenah inlet R-3246-A, Type C, K = 26
- Substituting in the formula Q = K D5/3
- Q = 26 x (.16)5/3 = 26 x .047 = 1.226 CFS
- By-pass 1.85 - 1.23 = 0.62 CFS
Step 4
Length to next inlet: Q / ICW = (1.23 x 43560) / (4 x
0.9 x 22) = 676 ft.
Solution

PROFILE
| Station |
Q Gutter |
Depth Gutter |
Q Grate |
Q Bypass |
Spread on Pavement |
| 10 + 10 |
1.85 cfs |
0.16' |
1.23 cfs |
0.62 cfs |
6.0' + 2' gutter |
| 10 + 60 |
0.62+ cfs |
0.11' |
N/A |
N/A |
3.5' + 2' gutter |
| 16 + 86 |
1.85 cfs |
0.16' |
1.23 cfs |
0.62 cfs |
6.0' + 2' gutter |
| 23 + 62 |
1.85 cfs |
0.16' |
1.23 cfs |
0.62 cfs |
6.0' + 2' gutter |
For additional information regarding Neenah Inlet Grate Capacities, please
contact Steven Akkala P.E., at (920) 729.3653 or email at steve.akkala@neenahenterprises.com.